Water Rights for Commercial Use
Washington exempts industrial use of up to 5,000 gallons a day from water right permits, and Ecology counts commercial use as part of it: water for "a store or restaurant, a small industrial facility, or irrigation of a small commercial farm, nursery, or garden." A few details matter:
- It's a daily cap. The 5,000 gallons is "a maximum daily amount for all use days, not an average."
- It can sit alongside household use. Ecology says a property can use 5,000 gallons a day for domestic use and another 5,000 for industrial use.
- Extra wells don't raise the limit. The exemption's limits apply to the whole project, not to each well, a rule the Washington Supreme Court confirmed in 2002 (Ecology v. Campbell & Gwinn).
- Larger systems need a permit. More than 5,000 gallons a day needs a water right, and Ecology treats systems serving 15 or more connections as municipal use, which also requires a permit.
(Source: Ecology Publication 19-11-090.)
When a Well Becomes a Public Water System
Being exempt from a water right doesn't exempt a well from drinking water rules. Under the Department of Health's rules, any system that pipes water for people to drink is a public water system, except one serving a single home or up to four homes on the same farm. There are two groups:
- Group B: fewer than 15 service connections and fewer than 25 people a day (or 25 or more for fewer than 60 days a year). State Group B rules don't cover one or two connections unless the local board of health has adopted its own (WAC 246-291-005). Two homes on one well are covered in our guide to sharing a well.
- Group A: 15 or more connections, or a system serving 25 or more people for 60 or more days a year, whether they're the same people (residents or employees, for example) or different people each day (WAC 246-290-020).
A shop with a few employees may stay below those lines. A store, restaurant, church or campground that serves the public can cross them. If you're not sure where your project lands, the regulator for your county can tell you before you commit to a design.
Site Approval Before Drilling
For a public water supply well, the location has to be approved by the Department of Health before construction begins (WAC 173-160-171). The department's guidance for new sources says to schedule a well site inspection with your local health jurisdiction or the department before drilling, and that a licensed professional engineer is part of the process (DOH Publication 331-674).
Both Group A and Group B wells need a sanitary control area with a minimum radius of 100 feet around the well, to keep sources of contamination away. That's a much bigger footprint than a private home well needs, so it's worth planning before the site is set.
Who regulates small systems in our counties
- Spokane County: the Washington State Department of Health (Group B program, Eastern Region office (509) 329-2100).
- Stevens County: the Northeast Tri-County Health District, which requires an inspection of the proposed well site (NETCHD Group B systems).
- Lincoln County: Lincoln County Public Health (drinking water program).
Private Commercial Wells
A well that only serves your own building, below the public water system thresholds, follows the same construction standards and setbacks as a home well: at least 100 feet from a septic drainfield and 50 feet from a septic tank, not inside a garage, barn, storage building or house, a surface seal at least 18 feet deep, and casing at least 6 inches above the ground (WAC 173-160). Ecology's notice of intent fee is $200 for a well with casing under 12 inches and $300 for 12 inches or larger. When the well is done, we file the well report with Ecology, which your building permit or water system paperwork will call for.