Skip to main content

Commercial Well Drilling in Eastern Washington

We drill wells for shops, businesses and other commercial properties outside city water in Spokane, Stevens and Lincoln Counties. The big question for a commercial well is who it will serve, so here's how Washington draws those lines.

Spring Creek Drilling well drilling trucks and equipment View larger photo

Water Rights for Commercial Use

Washington exempts industrial use of up to 5,000 gallons a day from water right permits, and Ecology counts commercial use as part of it: water for "a store or restaurant, a small industrial facility, or irrigation of a small commercial farm, nursery, or garden." A few details matter:

  • It's a daily cap. The 5,000 gallons is "a maximum daily amount for all use days, not an average."
  • It can sit alongside household use. Ecology says a property can use 5,000 gallons a day for domestic use and another 5,000 for industrial use.
  • Extra wells don't raise the limit. The exemption's limits apply to the whole project, not to each well, a rule the Washington Supreme Court confirmed in 2002 (Ecology v. Campbell & Gwinn).
  • Larger systems need a permit. More than 5,000 gallons a day needs a water right, and Ecology treats systems serving 15 or more connections as municipal use, which also requires a permit.

(Source: Ecology Publication 19-11-090.)

When a Well Becomes a Public Water System

Being exempt from a water right doesn't exempt a well from drinking water rules. Under the Department of Health's rules, any system that pipes water for people to drink is a public water system, except one serving a single home or up to four homes on the same farm. There are two groups:

  • Group B: fewer than 15 service connections and fewer than 25 people a day (or 25 or more for fewer than 60 days a year). State Group B rules don't cover one or two connections unless the local board of health has adopted its own (WAC 246-291-005). Two homes on one well are covered in our guide to sharing a well.
  • Group A: 15 or more connections, or a system serving 25 or more people for 60 or more days a year, whether they're the same people (residents or employees, for example) or different people each day (WAC 246-290-020).

A shop with a few employees may stay below those lines. A store, restaurant, church or campground that serves the public can cross them. If you're not sure where your project lands, the regulator for your county can tell you before you commit to a design.

Site Approval Before Drilling

For a public water supply well, the location has to be approved by the Department of Health before construction begins (WAC 173-160-171). The department's guidance for new sources says to schedule a well site inspection with your local health jurisdiction or the department before drilling, and that a licensed professional engineer is part of the process (DOH Publication 331-674).

Both Group A and Group B wells need a sanitary control area with a minimum radius of 100 feet around the well, to keep sources of contamination away. That's a much bigger footprint than a private home well needs, so it's worth planning before the site is set.

Who regulates small systems in our counties

  • Spokane County: the Washington State Department of Health (Group B program, Eastern Region office (509) 329-2100).
  • Stevens County: the Northeast Tri-County Health District, which requires an inspection of the proposed well site (NETCHD Group B systems).
  • Lincoln County: Lincoln County Public Health (drinking water program).

Private Commercial Wells

A well that only serves your own building, below the public water system thresholds, follows the same construction standards and setbacks as a home well: at least 100 feet from a septic drainfield and 50 feet from a septic tank, not inside a garage, barn, storage building or house, a surface seal at least 18 feet deep, and casing at least 6 inches above the ground (WAC 173-160). Ecology's notice of intent fee is $200 for a well with casing under 12 inches and $300 for 12 inches or larger. When the well is done, we file the well report with Ecology, which your building permit or water system paperwork will call for.

How it works

Three steps from your first call to a finished well.

  1. Step 1: Send us the address

    We reply within two business days

  2. Step 2: Get a free estimate

    Free, with no obligation

  3. Step 3: We drill your well

    One to three days on site for most wells

Questions about commercial wells

Does my business need a water right for its well?
When does a business well become a public water system?
Can you drill before the well site is approved?
Who regulates small (Group B) water systems here?
Service area map Spokane, Stevens and Lincoln Counties in Eastern Washington, with a dot for each community we drill in, shaded by median well depth. The town lists on this page give the same numbers. IDAHO CANADA Spokane Deer Park Cheney Colville Kettle Falls Chewelah Davenport Reardan
Median well depth Under 150 ft 150–199 ft 200–249 ft 250–299 ft 300 ft or more Our base in Reardan